美女18禁黄无遮挡网站,久久国产乱子精品免费女,日本高清视频网站WWW,岛国av无码免费无禁网站麦芽,久久久一本精品99久久精品66直播

New longer Fuxing bullet train to start operation in July

Source: Xinhua| 2018-06-08 17:16:08|Editor: Shi Yinglun
Video PlayerClose

BEIJING, June 8 (Xinhua) -- Three new longer Fuxing bullet trains will start to run on the Beijing-Shanghai line on July 1, China Railway Beijing Group Co. Ltd. said Friday.

With a designed speed of 350 kilometers per hour, the new train measures more than 400 meters in length and has 16 carriages, twice as many as current ones, according to the bureau. It can carry nearly 1,200 passengers.

Internet, power supply, and tourist information systems have all been upgraded on the new trains, said Zhang Bo, a researcher at the China Academy of Railway Sciences Corporation Limited.

The longer trains began testing in Beijing in June.

Entirely designed and manufactured in China, the Fuxing, or Rejuvenation, trains are more spacious and energy-efficient, with a longer service life and better reliability than previous models.

Over the past decade, China has rapidly developed its high-speed railways. The country currently has the world's longest high-speed rail network, about one-third of which has been designed to run at a speed of 350 km per hour.?

TOP STORIES
EDITOR’S CHOICE
MOST VIEWED
EXPLORE XINHUANET