美女18禁黄无遮挡网站,久久国产乱子精品免费女,日本高清视频网站WWW,岛国av无码免费无禁网站麦芽,久久久一本精品99久久精品66直播

China's first tidal power unit connected to grid for one year

Source: Xinhua| 2018-06-01 16:15:41|Editor: Li Xia
Video PlayerClose

HANGZHOU, June 1 (Xinhua) -- China's first tidal power station has been connected to the grid for a year, the longest stable use of the renewable energy, according to the developer.

The 3.4 mega-watt generating unit built by Hangzhou Lin Dong Ocean Energy Technology Co. Ltd. in Zhoushan City, east China's Zhejiang Province, has sent over 800,000 kilowatt hours of electricity to the grid.

Lin Dong, chief engineer and chair of the company, said on Thursday that when all turbines of the generating unit are installed in November, it will have an annual power output of 6 million kilowatt hours, enough for supplying electricity for 3,000 households annually.

The previous record of tidal energy power generation was set in Britain with a four-month supply in 2015.

He said the company is aiming at building a 15 mega-watt or 20 mega-watt power unit that can break even the cost, making the sustainable energy feasible.

Lin is expecting foreign orders, with representatives from Canada and New Zealand interested.

TOP STORIES
EDITOR’S CHOICE
MOST VIEWED
EXPLORE XINHUANET