美女18禁黄无遮挡网站,久久国产乱子精品免费女,日本高清视频网站WWW,岛国av无码免费无禁网站麦芽,久久久一本精品99久久精品66直播

Transport infrastructure recently completed in China

Source:Xinhuanet| 2018-01-09 15:45:48|Editor: Mengjie
Video PlayerClose

6.Yangshan Port, the world's biggest automated container terminal

Photo taken on Dec. 10, 2017 shows the Phase IV of Shanghai Yangshan Deep Water Port in Shanghai, east China. Located at the south of Donghai Bridge, phase IV of the Yangshan Port, the world's biggest automated container terminal, started trial operations on Dec. 10, 2017. It covers 2.23 million square meters and has a 2,350-meter shoreline. Once it enters full operation, the fourth phase of the Yangshan Port will initially be able to handle 4 million TEUs (twenty-foot equivalent units). The number will expand to 6.3 million TEUs at a later stage. (Xinhua/Ding Ting)

Photo taken on Dec. 10, 2017 shows the Phase IV of Shanghai Yangshan Deep Water Port in Shanghai, east China. Located at the south of Donghai Bridge, phase IV of the Yangshan Port, the world's biggest automated container terminal, started trial operations on Dec. 10, 2017. It covers 2.23 million square meters and has a 2,350-meter shoreline. Once it enters full operation, the fourth phase of the Yangshan Port will initially be able to handle 4 million TEUs (twenty-foot equivalent units). The number will expand to 6.3 million TEUs at a later stage. (Xinhua/Ding Ting)

   Prev 1 2 3 4 5 6 7 Next  

KEY WORDS: Transport
EXPLORE XINHUANET